Glasgow And Ships Of The Clyde

Arrival

Monday, July 30, 1962 @ 1100
NEWSHOT (1947-1973 Self-propelled 60-ton capacity floating heavy lift crane of Clyde Navigation Trust / Clyde Port Authority, Glasgow) Own Page

NEWSHOT loads 3 heavy lifts of 33 tons onto Ellerman's ANGLIAN

Arrived in berth19 Prince's Dock (alongside ANGLIAN)Port of RegistryGlasgow

At 1200 on 28th July 1962 ANGLIAN arrived in Prince's Dock from Mediterranean Ports via Liverpool.

On 30th July at 1100 the floating crane NEWSHOT came alongside and loaded 3 heavy lifts totalling 33 tons onto ANGLIAN

ANGLIAN sailed from Glasgow for Mediterranean Ports via Newport (South Wales) at 2120 on 31st July