Glasgow And Ships Of The Clyde

Arrival

Monday, December 17, 1962 @ 0805
ONWARD PROGRESS (1959 - 1974 Products tanker 144 feet long of Fleetwood Tankers Ltd / B.A. Parkes, Fleetwood) Own Page

ONWARD PROGRESS arrives in Ardrossan to load Gas Oil for Stornoway (Outer Hebrides, Scotland)

Arrived fromWorkington (Cumberland / Cumbria, on the North-west coast of England)Port of RegistryFleetwood England, U.K.)
Arrived in berthArdrossan Harbour Net Tonnage144
Master of vessel on arrivalB BeaversGross Tonnage345
Draught aft on arrival8' 6"
Cargo carried on arrivalLight - no cargo on board
Ships agentR L Alpine, Ardrossan