Glasgow And Ships Of The Clyde

Ship Movement

Tuesday, March 17, 1964 @ 1140
CLAN MACTAVISH ( 1949 - 1971 General cargo liner 506 feet long of Clan Line Steamers, Glasgow : Scrapped 1971) Own Page

CLAN MACTAVISH shifts from King George V Dock, Glasgow to Elderslie Drydocks

Arrived fromDurban and Cape Town via LiverpoolPort of RegistryGlasgow
Arrived in berth8 / 9 King George V Dock, Glasgow (with head south)Gross Tonnage8,035
Sailing forCape Town via Birkenhead
Sailed from berth8 King George V Dock, Glasgow (with head south)
Draught forward on arrival17' 05"
Draught aft on arrival18' 03"
Cargo carried on arrival2,050 tons of general cargo
Commenced discharge of inward cargo0800 on 13th March
Stevedore discharging inward cargoRenfrew Stevedore Company
Completed discharge of inward cargo1530 on 26th March
Commened loading outward cargo0800 on 31st March
Outward cargo700 tons of general cargo
Stevedore loading outward cargoRenfrew Stevedores Company
Completed loading outward cargo1600 on 3rd April
Draught forward on sailing11' 09"
Draught aft on sailing20' 00"
Engine trials3rd April from 1645 to 1725
Ships agentCayzer, Irvine & Co. Ltd. / Clan Line, 109 Hope Street, Glasgow

   CLAN MACTAVISH arrived at Glasgow at 0430 on 13th March 1964 with 2,050 tons of general cargo from Durban and Cape Town via Liverpool and berthed at berth 8 / 9 King George V Dock with her head south and was drawing 17’ 05” forward and 18’ 03” aft.   Her Agent was Cayzer Irvine at 109 Hope Street, Glasgow.

   Renfrew Stevedores boarded at 0800 on 13th March and commenced discharge of cargo, completing discharge at 1530 on 26th March.

   At 0700 on 17th March she shifted astern along the Dock wall from berth 8 / 9 to berth 9 and at 1410 that day, with draught forward 12’ 00” and aft 18’ 05” she was towed astern from King George V Dock moving a short distance downriver to the nearby Elderslie Drydocks for drydocking.   She undocked at 2130 on 23rd March and was towed upriver to berth 9 King George V Dock.

   Another shift, this time at 1630 on 26th March, shifting ahead along the Dock wall from berth 9 to berth 8.

   Renfrew Stevedores started loading 700 tons of general cargo at 0800 on 31st March and completed loading at 1600 on 3rd April.

   Just after loading was finished the ship had engine trials from 1645-1725.

   CLAN MACTAVISH left Glasgow at 1205 on 4th April for Cape Town via Birkenhead, her draught forward being 11’ 09” and aft 20’ 00”