Arrived from | Cape Town (South Africa) via Barrow-in-Furness (England) | Port of Registry | Glasgow |
---|
Arrived in berth | 9 King George V Dock, Glasgow (with her head south) | | |
---|
Sailing for | Bombay via Birkenhead | | |
---|
Sailed from berth | 7 King George V Dock, Glasgow (with her head south) | | |
---|
Draught forward on arrival | 12' 00" | | |
---|
Draught aft on arrival | 17' 00" | | |
---|
Cargo carried on arrival | General cargo 1.042 tons | | |
---|
Commenced discharge of inward cargo | 0800 on 26th August | | |
---|
Stevedore discharging inward cargo | Renfrew Stevedoring Company Limited, King George V Dock, Glasgow, S.W.1. Telephone GOVan 2241 | | |
---|
Completed discharge of inward cargo | 0900 on 3rd September | | |
---|
Commened loading outward cargo | 0800 on 2nd September | | |
---|
Outward cargo | General cargo 750 tons | | |
---|
Stevedore loading outward cargo | Renfrew Stevedoring Company Limited, King George V Dock, Glasgow, S.W.1. Telephone GOVan 2241 | | |
---|
Completed loading outward cargo | 1000 on 4th September | | |
---|
Draught forward on sailing | 13' 00" | | |
---|
Draught aft on sailing | 16' 06" | | |
---|
Engine trials | From 1140 to 1230 hours on 4th September 1964 with rope across dock | | |
---|
Vessel drydocked | Govan Drydock, Glasgow from 27 to 30 August | | |
---|
Ships agent | Cayzer, Irvine & Co. Ltd. / Clan Line, 109 Hope Street, Glasgow, C.2. Telephone CENtral 7050 | | |
|