Arrived from | Govan Dry Dock, Glasgow .... vessel had entered drydock on arriving at Glasgow | Port of Registry | Glasgow |
---|
Arrived in berth | 8 King George V Dock, Glasgow (with her head south) | Gross Tonnage | 9,292 |
---|
Sailing for | Durban and Lourenco Marques via Swansea | | |
---|
Sailed from berth | 8 King George V Dock, Glasgow (with her head south) | | |
---|
Draught forward on arrival | 9' 09" | | |
---|
Draught aft on arrival | 15' 10" | | |
---|
Cargo carried on arrival | Light-ship (= empty of cargo = no cargo on board) | | |
---|
Commened loading outward cargo | 0900 on 8th January | | |
---|
Outward cargo | General cargo 300 tons | | |
---|
Stevedore loading outward cargo | Renfrew Stevedoring Company Limited, King George V Dock, Glasgow, S.W.1. Telephone GOVan 2241 | | |
---|
Completed loading outward cargo | 1500 on 10th January | | |
---|
Draught forward on sailing | 12' 00" | | |
---|
Draught aft on sailing | 15' 10" | | |
---|
Engine trials | From 1210 to 1225 on 10th January with rope across dock | | |
---|
Ships agent | Cayzer, Irvine & Co. Ltd. / Clan Line, 109 Hope Street, Glasgow, C.2. Telephone CENtral 7050 | | |
|